How do I get my kitchen order started?

Once the plan and price are agreed on, we will prepare a contract, listing all of the work to be done and the choices made. Cabinet orders take from 4 to 6 weeks, after we have all the material on site we will call and schedule a starting date. Installation times vary, typically a kitchen takes from one to two days depending on the complexity of the project.  A more compact kitchen can be installed in as little as a day. 



What do I need to do to prepare for my kitchen renovation?

It is a good idea to determine what you will be using for an eating and cooking area while your kitchen is under construction. All items need to be removed from the area where construction will take place. Ensure all plugs and switches are moved in the correct location, your designer can indicate where all of this should be positioned. 



What will my new kitchen cost?

Remodelling a kitchen is kind of like buying a new car. The base model is thousands cheaper than the loaded model. The more accessories you add, the total price will increase accordingly. 



Where do I start?

If  you are building a new home, email or bring your plans into our showroom. If you are remodelling your present kitchen and want some idea what it will cost and what can be done, make an appointment for one of our designers to drop by and give you a kitchen estimate. Bring in any clippings from magazines of ideas that you like a picture is worth a thousand words and helps us visualize the look you are going for, based on this we will help you make some choices and come up with a cost range. If the figure is more than you expected, don't be disappointed, there are so many design choices to bring the project within your budget. If you are happy with the price, we then come into your home to take final measurements and make any design changes that you would like. Once you've made all choices we will present you with an estimate and perspective drawings, that will give you a very real understanding of what how your kitchen or vanity will look like when completed.



How long does your design process take? 

A typical meeting with our design staff lasts about an hour. Depending on the size of your kitchen. The entire process, including securing your approval for the final design, should take anywhere from a week to two weeks.



Is there a charge for the Design service?

Dream Kitchens provide a design consultation and estimate at no charge! One of our the designers will come to your house to take initial measurements and create a preliminary 3D drawing based on the design you have selected. However floor plans, and other detailed documents remain the property of Dream Kitchens until the design is approve by the client and the contract is signed.

 